Air Lifter

Air Lifter Introduction

60% Complete
Air Lifter     

【Advantages】

Scientific and reasonable design, decrease the damage to carbon.

High efficiency, the time of lifting carbon is 0.5~1 hours.

Small volume, it is convenient to install on leaching agitation tank or adsorption tank; convenient operation and maintenance.

【Product Structure】

St-Drawing of Air Lifter

Click Image to Zoom

Pressure air is inflated into air lifter, which reduces the air density of ore pulp pipe and causes the pressure difference between pipe and tank. By the action of pressure, ore pulps in tank are lifted by air lifter.

【Technical Parameters】

Model Carbon adsorption pipe specification Air pipe specification Application range
KT60 Φ50×2.5 DN20 SJ2.0×2.5, SJ2.5×2.5, SJ2.5×3.15, SJ3×3.15, SJ3×3.5, SJ3.15×3.55
KT100 Φ108×4 DN25 SJ3.55×4, SJ4×4.5, SJ4.5×5, SJ5×5.6,SJ5.5×6, SJ7.5×8, SJ8×8.5
KT125 Φ133×4 DN32 SJ8.5×9, SJ9×9.5, SJ10.5×11
KT150 Φ159×4 DN40 SJ12×13

Leave your message

Company Culture

60% Complete

Our Goals:

"Providing comprehensive mining development solutions, manufacturing mining machinery products with advanced technology, environmental protection, high efficiency and energy saving technology, and achieving maximization value for global mining customers."

Our Vission:

"Based in China, Xinhai wants to be one of world top developers, manufacturers, service providers and engineering contractors of mining technology and mining machinery."

Case

60% Complete

1,200T/D GOLD PROCESSING PROJECT OF BULSOWA IN TANZANIA

1,200t/d mineral processing plant of Bulsowa in Tanzania was an EPC project contracted by Xinhai, Xinhai provided thickening, leaching, desorption.

Species : gold ore

Capacity: 1200t/d

Process : adopts all-slime cyanidation process with thickening, leaching and desorption electrolysis process, dry tailings stacking